CPTS has completed over 6500 tests in Queensland alone

 

Gladstone mudflats c
This was the first time the hoverbarge and min-icrawler had worked together, it was nice to see it working so well

Client: Golder Associates for the QGC LNG Pipeline

Brief: Conduct CPTu testing on intertidal mudflats utilising the most efficient means possible.

Solution: The CPTS hoverbarge was utilised to transport the CPTS mini-crawler rig to each designated test location. The weight of the mini-crawler and hoverbarge negated the need to anchor the CPT equipment so this part of the testing was completed much more efficiently than previous methods.