At one point vehicle was driving along a taxiway and tailgating a jumbo jet. The last test location was between the main taxiway and runway. Vehicle was about 15m away from the boundary of the main runway. “That was lots of fun
Site description: Testing conducted beside operational runways.
Challenge: Critical time constraints to work within required all aspects of the testing programme to run with a high level of efficiency.
Solution: CPTS purpose built two vehicles to access the different areas, this enabled CPTS to complete the testing in the tight timeframes given.
Result: Everything ran like clockwork.